On-going Projects

KENYA PIPELINE COMPANY (NAIROBI, KENYA)
Scope of work included:
  1. Repairs to external and fixed floating roof tanks with diameters up to 58m. Works included bottom, annular, shell plates, floating roofs, wind girders.
  2. Gritblasting and painting
  3. NDT, testing and commissioning
  4. Construction of new fixed and floating roof storage tanks in accordance with API 650
EAST AFRICAN STORAGE (NAIROBI, KENYA)
Scope of work included:
  1. Piping works
KAPA OIL REFINERIES LTD – NAIROBI, KENYA
Scope of work included:
  1. Design, fabrication and erection of 6 NO 1,000M3 edible storage tanks(TO API 650) complete with piping
VIPINGO INDUSTRIES LTD – MOMBASA, KENYA
Scope of work included:
  1. Fabrication and erection of edible storage tanks(TO API 650)
  2. Edible oil refining Plant equipment Erection and Piping
PWANI OIL PRODUCTS LTD – MOMBASA, KENYA
Scope of work included:
  1. Design, fabrication and erection of various edible storage tanks(TO API 650)
KENYA PIPELINE COMPANY
Scope of work included:
  1. Installation of Aluminium Geodesic dome roof.
FUJITA CORPORATION
Scope of work included:
  1. Construction of Dongo Kundu bridges
TOTAL
Scope of work included:
  1. Upgrading of fuel storage terminal and firefighting system to Total standards
CHINA COMMUNICATIONS CONSTRUCTION COMPANY LTD
Scope of work included:
  1. General Fabrication
SHELL/ VIVO ENERGY KENYA LIMITED
Scope of work included:
  1. Tank maintenance contract
completed

Past Completed Projects

DRA MINERAL PROJECTS (SOUTH AFRICA)
Scope of work included:
  1. Design, fabrication and erection of 3no fuel storage farms (to API 650) complete with piping, truck offloading and equipment and light vehicle loading facilities
  2. Fabrication of steel penstock tubes (3.5m dia x 10.8m x 12mm thick), erection on site and welding
  3. Fabrication of various steel structures for the plant
CHINA NATIONAL AERO-TECHNOLOGY IMPORT AND EXPORT CORPORATION
Scope of work included:
  1. Supply & installation of 2,200m of 14” pipe
  2. Supply & installation of 44no. Aircraft Rated fuel Hydrant pits
  3. NDT on the entire System
  4. Commissioning of System and fuel Flushing

BURMEISTER AND WAIN SCANDINAVIAN CONTRACTOR AS –BWSC (DENMARK)
Scope of work included:
  1. HFO and other storage tanks I.A.W API 650. Maximum capacity 5,000m3
  2. Complete mechanical erection, and piping works
PUMA ENERGY (SOUTH AFRICA)
Scope of work included:
  1. Installation of 2km x 14” DIA Airport fuel Hydrant pipelines C/W hydrant pits ands all other accessories.
  2. NDT and testing
Artumas Gas and Power
Scope of work:
  1. Msimbati Gas Production Facility (25mmscfd)
  2. Mtwara Gas Receiving Facility (10mmscfd)
  3. Gas Transmission Pipelines
  4. Offshore Wellhead Pipework.
  5. Structural Steel Fabrication And Erection For Pipe-Racks
  6. 4no - 80cm Vertical Storage Tanks.
  7. Pipeworks Constructed To Ansi B31.3,
  8. Gritblasting And Epoxy Painting Of All Pipes And Structural Steel.
KENYA SHELL LTD /VIVO ENERGY KENYA LTD (NAIROBI, KENYA)
Scope of work included:
  1. Greenfield fuel storage terminal – Nanyuki Kenya
  2. Various fuel storage tanks throughout kenya I.A.W API 650. Maximum capacity 23,000M3. 40M DIA with aluminium dome roof for diesel
  3. Truck loading and metering facilities
  4. Pipelines
PWANI OIL PRODUCTS LTD – MOMBASA, KENYA
Scope of work included:
  1. Design, fabrication and erection of various edible storage tanks(TO API 650)
KENYA PORTS AUTHORITY FUEL AND OIL PIPELINE RELOCATION AND VARIOUS OTHER WORKS
Scope of work included:
  1. Fuel and Oil pipeline relocation and various other works

BASE TITANIUM MINES KWALE
Scope of work included:
  1. Fabrication of various tanks, hoppers and skibs
TOTAL
Scope of work included:
  1. Upgrade of LPG firefighting system
  2. Construction of 2 x 2million litre fire water tanks

BURMEISTER AND WAIN SCANDINAVIAN CONTRACTOR
Scope of work included:
  1. Fabrication of power station service tanks and vessels
ENGEN
Scope of work included:
  1. Rehabilitation of 2 x 28 metres DIA PMS storage tanks in Dar es salam for Engen
  2. Installation of internal floating roof
Oryx Tanzania
Scope of work included:
  1. Upgrade of LPG firefighting system